Uploaded image for project: 'ZABBIX BUGS AND ISSUES'
  1. ZABBIX BUGS AND ISSUES
  2. ZBX-23559

SLI drops under maintenance if maintenance was added after the problem was started

XMLWordPrintable

    • Sprint 105 (Oct 2023), Sprint 106 (Nov 2023), Sprint 107 (Dec 2023)
    • 1

      Steps to reproduce:

      1. create trigger with trapper item to fire up on 0 to 1 change
      2. create SLA report
      3. create maintenance and ensure maintenance is set on the host
      4. fire up the trigger
      5. SLI is not dropped
      6. clean up the trigger state to OK
      7. remove maintenance
      8. fire up the trigger once again
      9. wait some time to drop the SLI
      10. create maintenance and ensure maintenance is set on the host
      11. SLI continues to drop

      Result:
      SLI drops even if maintenance assigned

      Expected:
      The standard ITIL / ISO manual the SLI of a system does not decrease anymore as soon as it is put into maintenance. It should not recalculate in the past, but SLI should not drop with maintenance added during the issue.

            dgoloscapov Dmitrijs Goloscapovs
            edgar.akhmetshin Edgar Akhmetshin
            Team A
            Votes:
            1 Vote for this issue
            Watchers:
            10 Start watching this issue

              Created:
              Updated:
              Resolved: