Uploaded image for project: 'ZABBIX FEATURE REQUESTS'
  1. ZABBIX FEATURE REQUESTS
  2. ZBXNEXT-1061

Ability to switch items in simple graphs, but keep the temporal settings

XMLWordPrintable

      Scenario: Something goes wrong on a host

      I figure out A has alerting values. It comes to my mind, to check the development of B, because it is related to A.

      Being in Latest data, I went on to see one of the simple graphs. Switching to a different simple graph, I must return to Latest data and follow the link to the desired simple graph. That alone is not very efficient, but worse: The temporal settings are lost, so I have to set that again over and over.

      This ticket is related to ZBXNEXT-862.

      I know you can switch by replacing the itemid Get parameter, but that's not very handy and the temporal settings are lost either way, it seems.

      I'd be hoping for a simple way to switch through hosts and items, keeping my temporal settings. Even more fancy: A method to quickly throw all these graphs on top of another to compare them easily.

      keywords : period

            Unassigned Unassigned
            volter Volker Fröhlich
            Votes:
            17 Vote for this issue
            Watchers:
            15 Start watching this issue

              Created:
              Updated: