      Description

      There can be scenarios where an action operation shall be postponed in case it would take place beyond a certain time period.
      Using a regular action condition does not help here, since it would on the one hand consider the event time respectively step 1 only and on the other hand leads to ignore the event generally.

      It would be nice, if it would be somehow possible to configure time periods per action operation, like it is currently possible in regular action conditions.
      For example, when an operation would take place beyond such a time period, it would be postponed/delayed (not omitted) to the beginning of next defined period.
      Potentially subsequent intervals/steps beyond specified time of an operation should probably be discarded.

      I could also think of allowing to choose whether the operation should be postponed either beyond or within the specified time period(s).

        Attachments

          Activity

            People

            Assignee:
            Unassigned Unassigned
            Reporter:
            okkuv9xh Marc
            Votes:
            1 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated: