-
Type:
Change Request
-
Resolution: Unresolved
-
Priority:
Trivial
-
None
-
Affects Version/s: None
-
Component/s: Frontend (F)
-
None
-
Environment:Zabbix 4.0.7
When an normal operation is delayed in an action (such as a down message) it is possible that the recovery operation will action (such as a up message) if the trigger recovers before the normal operation is performed.
This can cause confusion for the recipients if they have not received a message stating the problem and only receive the recover message.
My suggestion would be to allow a toggle on the recovery operation to only be performed if any or specific normal operations have been performed.