Custom periods for Scheduled Reports

XMLWordPrintable

    • Type: New Feature Request
    • Resolution: Unresolved
    • Priority: Trivial
    • None
    • Affects Version/s: None
    • Component/s: Frontend (F), Server (S)
    • None

      Please consider the possibility of adding a more flexible report period system in Scheduled Reports. Alongside options like "Previous Day," "Previous Week," etc., it would be great to have the ability to generate reports with data up to the moment of their generation, for example, "now-7d to now." This would allow generating reports with real-time data, which is extremely useful.

       
      Thanks in advance.

            Assignee:
            Valdis Murzins
            Reporter:
            Oleh Kolesnyk
            Votes:
            1 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated: