[ZBXNEXT-2312] Option to postpone an action operation Created: 2014 May 21  Updated: 2014 May 21

Status: Open
Project: ZABBIX FEATURE REQUESTS
Component/s: Server (S)
Affects Version/s: 2.2.2
Fix Version/s: None

Type: New Feature Request Priority: Major
Reporter: Marc Assignee: Unassigned
Resolution: Unresolved Votes: 1
Labels: delay, operations, period
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified


 Description   

There can be scenarios where an action operation shall be postponed in case it would take place beyond a certain time period.
Using a regular action condition does not help here, since it would on the one hand consider the event time respectively step 1 only and on the other hand leads to ignore the event generally.

It would be nice, if it would be somehow possible to configure time periods per action operation, like it is currently possible in regular action conditions.
For example, when an operation would take place beyond such a time period, it would be postponed/delayed (not omitted) to the beginning of next defined period.
Potentially subsequent intervals/steps beyond specified time of an operation should probably be discarded.

I could also think of allowing to choose whether the operation should be postponed either beyond or within the specified time period(s).


Generated at Sun Apr 06 21:12:22 EEST 2025 using Jira 9.12.4#9120004-sha1:625303b708afdb767e17cb2838290c41888e9ff0.