Uploaded image for project: 'ZABBIX BUGS AND ISSUES'
  1. ZABBIX BUGS AND ISSUES
  2. ZBX-16452

Screens display working time if dynamic graph element is used

    Details

    • Team:
      Team B
    • Sprint:
      Sprint 56 (Sep 2019), Sprint 55 (Aug 2019)
    • Story Points:
      1

      Description

      Steps to reproduce:

      1. Create a graph (or graph prototype) with option Show working time switched off
      2. Add the graph (or prototype) to a screen with dynamic option enabled

      Result:
      The working time is displayed in the background of the graph.

      Expected:
      The working time is not displayed in the background.

      Notes:
      If the graph is not set to dynamic, working time is not displayed.
      This works properly on the dashboards with dynamic classic graphs, only screens are affected

       

       

        Attachments

          Activity

            People

            • Assignee:
              averza Andrejs Verza
              Reporter:
              kaspars.mednis Kaspars Mednis
            • Votes:
              1 Vote for this issue
              Watchers:
              6 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: