Uploaded image for project: 'ZABBIX BUGS AND ISSUES'
  1. ZABBIX BUGS AND ISSUES
  2. ZBX-16452

Screens display working time if dynamic graph element is used

    XMLWordPrintable

Details

    • Team B
    • Sprint 56 (Sep 2019), Sprint 55 (Aug 2019)
    • 1

    Description

      Steps to reproduce:

      1. Create a graph (or graph prototype) with option Show working time switched off
      2. Add the graph (or prototype) to a screen with dynamic option enabled

      Result:
      The working time is displayed in the background of the graph.

      Expected:
      The working time is not displayed in the background.

      Notes:
      If the graph is not set to dynamic, working time is not displayed.
      This works properly on the dashboards with dynamic classic graphs, only screens are affected

       

       

      Attachments

        Activity

          People

            averza Andrejs Verza
            kaspars.mednis Kaspars Mednis
            Votes:
            1 Vote for this issue
            Watchers:
            6 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: